Paver patios built for Michigan ground
This is what we specialise in. Patios, retaining walls, fire pits, outdoor kitchens, walkways and front entries — designed for freeze-thaw, built on base we will happily explain in detail, and warrantied. Start with a free AI concept of your own yard.
AI Hardscape Preview
Free · No sign-up · 60 secondsDrop a photo of your yard hereor tap to take one right now
Stand where you would sit. A single wide shot of the whole area works best.
Hardscape services
Paver Patios
The core of what we do. Properly based, properly drained, properly edged — flat in ten years, not three.
Paver patiosRetaining & Seat Walls
Structural walls that hold grade, and seat walls that turn a patio into a room.
Retaining wallsFire Pits & Fireplaces
The reason the patio gets used in October. Gas or wood, built-in or freestanding.
Fire pitsOutdoor Kitchens
Grill surrounds, counters, storage and utilities, engineered to survive a Michigan winter outdoors.
Outdoor kitchensWalkways & Front Entries
The first thing anyone sees. Also the cheapest way to make a house look ten years newer.
WalkwaysPaver Driveways
Heavier base, heavier paver. Built to take a truck and forty Michigan winters.
Paver drivewaysPorch & Step Rebuilds
Cracked, heaved concrete stoops rebuilt in paver or natural stone, to code and to scale.
Porch & stepsDrainage & Grading
The unglamorous work that decides whether everything above it survives. Often the real fix.
DrainageCost Guide
Real installed prices for every service above, and what actually moves the number.
See costsThe part you never see is the part that matters
Anyone can lay pavers in a pattern. What separates a patio that lasts from one that waves like a funhouse floor is entirely underneath it.
- Excavate to depth. Not just enough to hide the edge.
- Compact in lifts. Aggregate goes down in layers, each one compacted. One thick dump-and-roll is how you get settling.
- Design the drainage first. Water that cannot leave is what heaves a patio in February.
- Screeded bedding layer. Consistent depth, so the surface is flat and stays flat.
- Proper edge restraint. Pavers spread sideways without it. Every year.
- Polymeric sand. Locks the joints, resists weeds and washout.
Hardscaping near you
Hardscaping questions
How much does a paver patio cost in Macomb County?
Most paver patios we build run $18 to $30 per installed square foot depending on material, site access and how much grading the yard needs. A typical 400 square foot patio lands between $7,000 and $12,000, quoted as one fixed price after a free on-site measure. See our hardscape cost guide for the full breakdown.
What makes a paver patio survive Michigan freeze-thaw?
Base, base and drainage. We excavate to proper depth, compact aggregate in lifts rather than one dump-and-roll, set a screeded bedding layer, and finish with polymeric sand. Water that cannot escape is what heaves a patio, so grading and drainage get designed before a single paver is laid.
Do you design as well as install?
Design is where every project starts. Use the free AI Hardscape Preview on this page for an instant concept of your own yard, and our designers turn it into a scaled, buildable plan with material samples and a fixed price.
How long does a patio installation take?
A straightforward 300 to 500 square foot patio is typically three to five working days on site. Retaining walls, outdoor kitchens and multi-level builds run longer. We give you the schedule in the proposal, and we do not start a job we cannot finish.
When is the best time to build in Michigan?
April through November is the main build season, but the smartest time to design is winter — the calendar is open, material lead times are short, and you are first out of the gate in spring. Design work happens year-round.
Do you warranty the work?
Yes. Every hardscape install carries a workmanship warranty, and we are licensed and insured. Manufacturer warranties on the pavers themselves come with your material package.
Let us design something.
Free AI concept above, free on-site measure after, fixed price before anything is dug.
