Key takeaways
- Clear-by times come from the service calendar: every visitation, service and procession, including evenings and weekends.
- No equipment runs during a service. Plow and treat before doors open, then wait for the procession to leave.
- Where the porte-cochère serves as a loading zone, the 2010 ADA Standards call for an access aisle at least 60 inches wide. Keep it clear.
- Treat walks, steps and the porte-cochère before every service, and again before evening visitations, when meltwater refreezes.
On this page
What makes a funeral home different?
Most commercial lots run on business hours. A funeral home runs on a calendar that changes as services are booked, and every entry on it is fixed. Visitors are often older, dressed for a service rather than a storm, carrying flowers and not watching their feet. The CDC says about 1 in 4 adults 65 and older report a fall each year, and that falls are the leading cause of injury death in that age group.
A church shares some of this, but its calendar mostly repeats week to week. A funeral home adds a hearse and limousines, a procession that lines up in the lot, and evening visitations that begin after the morning's treatment has worn off.
What gets cleared first, and by when?
| Priority | Area | Clear by |
|---|---|---|
| 1 | Porte-cochère, drop-off lane and its access aisle | The family's arrival |
| 2 | Accessible spaces, curb ramps and the route to the doors | The family's arrival |
| 3 | Entrance walks, steps and landings, treated | Doors open |
| 4 | The hearse route, from the door to the hearse and out to the street | Before the casket is moved |
| 5 | Procession lineup lanes and the exit | Before guests line up |
| 6 | Visitor parking rows | Doors open |
| 7 | Staff parking and service doors | Staff arrival |
An evening visitation resets the clock: walks and the porte-cochère are treated again before its doors open.
What do the porte-cochère and the hearse route need?
The porte-cochère is where families arrive and where the casket leaves. Where it serves as a passenger loading zone, the 2010 ADA Standards (209.2.1 and 503) call for at least one accessible zone in every 100 feet of it: a pull-up space at least 96 inches wide and 20 feet long, with an access aisle at least 60 inches wide along its full length, level with the pull-up space and joined to an accessible route. A ridge of plowed snow in that aisle turns the drop-off into a curb. Federal rules at 28 CFR 36.211 require businesses open to the public to keep accessible features working, allowing only temporary interruptions. See ADA and snow.
The hearse route is the path the casket travels, from the door across the pavement to the back of the hearse. Pallbearers, often family members, carry a heavy load and cannot see their feet. Clear that path wider than a walk, treat it, and check it again just before the casket comes out. Limousines are long and sit low, so a windrow left across the driveway apron or the porte-cochère exit can hang one up.
How should the procession lineup be handled?
Mark the lineup lanes as a no-stack zone on the site map. Plow them full width, push the snow beyond them rather than into them, and keep the exit clear. Keep piles low at the driveway so the lead car and any escort can see traffic both ways. If the procession goes to a cemetery, its drives are the cemetery's to clear, so the funeral director confirms they will be open.
The other no-stack zones are the porte-cochère and drop-off lane, accessible spaces and aisles, and the hearse route. Before the first storm, stake what a blade can hit: porte-cochère columns and curbs, bollards, curb ramps, parking blocks, light-pole bases, signs, flagpoles and the landscape lights along entrance walks.
When can the plows run?
Never during a service. A backup alarm, headlights sweeping the windows or a snowblower outside the chapel is not acceptable, and families remember it. The working rule:
- Plow and treat before doors open, with time to spare.
- If snow keeps falling during a service, only quiet hand work: shovels and brooms on walks, steps and the porte-cochère.
- Plow again after the procession leaves or the visitation ends.
- Return after the last evening visitation to clear and treat for the next morning, because meltwater refreezes overnight.
Weekend services and visitations need the same coverage as weekdays, so ask how the contractor staffs Saturdays and holiday weekends.
What should the funeral director send the contractor?
A calendar, kept current. For each service, send the date, visitation times, service time, procession departure time and whether limousines are coming, on the day the service is booked, and get a confirmation back. The contractor needs times, not names.
Add a storm-morning contact who can confirm at 5 a.m. that the 10 a.m. service is still on. Staff who work outside, such as parking attendants, are covered by OSHA's walking-working surface rule, which names snow and ice among the hazards employers must keep off walking surfaces (29 CFR 1910.22). Ice cleats help them between visits.
Records and contract questions
Keep timestamped records of every visit and treatment, plus staff walk-throughs before doors open. The service calendar itself shows when the building was in use. See snow logs. Before signing for commercial snow removal, ask:
- Are clear-by times set per service from the calendar, including evenings and weekends?
- What happens when snow falls during a service?
- Are the porte-cochère, its access aisle and the hearse route treated before every service?
- Are the lineup lanes and the exit no-stack zones on the site map?
- Is there a return visit after evening visitations?
- How are new services added, and who confirms them?
Sources
- 28 CFR 36.211, maintenance of accessible features (eCFR)
- U.S. Department of Justice: 2010 ADA Standards for Accessible Design — 209.2.1 and 503: passenger loading zones
- CDC: older adult falls data — about 1 in 4 adults 65 and older report a fall each year
- OSHA 29 CFR 1910.22, walking-working surfaces: general requirements — snow and ice; drainage and dry standing places for wet processes